24-hour pilot reviews for commercial subcontractors

Catch scope gaps before bid day.

Upload plans, specs, addenda, and bid instructions. Get a structured scope summary, RFI candidates, exclusions, risk flags, and an estimator-ready bid checklist.

Scope Summary

Trade-specific checklist across plans, specs, and bid instructions.

RFI Candidates

Draft questions for missing, conflicting, or ambiguous requirements.

Risk Flags

Late addenda, bid-form issues, exclusions, alternates, and document gaps.

Narrow Wedge

Commercial subs bidding recurring PDF-heavy packages.

Human Reviewed

AI-assisted drafts stay behind estimator judgment and QA.

Fast Validation

Built to sell paid pilots before heavy product investment.

Pilot Intake

Submit a bid package for review.

This MVP simulates the concierge workflow. In production, the same intake would notify the operator, store files, run extraction, and queue the bid package for human QA.

First pilot deliverable

  • Scope summary and bid instruction notes
  • RFI candidates with trade-specific prompts
  • Exclusions, clarifications, and bid-day checklist

Sample Deliverable

Live bid review preview

Review Confidence

48%
Scope Summary
  • Primary review path set for Electrical scope across plans, specs, addenda, and bid instructions.
  • lighting controls and switchgear should be checked against schedules, details, and spec sections before pricing is locked.
  • Bid form was not detected in uploaded file names; request or locate it before finalizing the proposal.
  • No estimator notes provided yet; add known assumptions, vendor dependencies, and open questions before review.
Bid-Day Checklist
  • Confirm bid form, alternates, allowances, unit prices, and addenda acknowledgment.
  • Review relevant spec divisions against drawing schedules and notes.
  • Send RFI candidates before the GC cutoff.
  • Collect vendor quotes and qualify lead times.
  • Run final exclusions/clarifications review with estimator before submission.
RFI Candidates
  • Clarify whether temporary power is included in base bid or carried as an alternate.
  • Confirm responsibility boundaries for low-voltage exclusions where plans and specifications do not align.
  • Ask whether any addenda have been issued since the bid package was received.
  • Request clarification for any scope shown on drawings but missing from the relevant spec section.
Risk Flags

Document completeness

High

Plans or specs were not detected; review is incomplete without both.

Late addenda exposure

High

No addenda detected. Verify status with GC before bid day.

Bid-day ambiguity

High

No due date entered. Bid-day timeline and escalation path are unknown.

Exclusions / Clarifications
  • Exclude work outside Electrical contract documents unless specifically listed in the proposal.
  • Exclude permit fees, utility company charges, premium time, and design/engineering unless documents require inclusion.
  • Clarify assumptions around lighting controls, temporary power, and field coordination with adjacent trades.
  • Proposal should state that addenda received after final review are excluded unless acknowledged in writing.

PMF Sprint

Fourteen days to prove or kill it.

The build is intentionally designed around paid pilot learning. The full sprint plan lives in docs/construction-bid-desk-mvp-sprint-plan.md.

150

targeted contractors contacted

15

replies from estimators or owners

8

discovery calls booked

3

real bid packages submitted

2

paid pilots closed

1

repeat-use request

Single Bid Review

$199-$299

One 24-hour review for a real bid package. Best for first trust test.

Bid Week Assist

$799-$1.5k

Three to five bid packages with prioritized turnaround during a busy week.

Monthly Pilot

$1.5k-$3k

Recurring bid desk support with agreed volume, QA loop, and feedback tracking.